A North Sea operator needed to confirm that no pressure had built up beneath shallow-set barriers before recovering completions, so it could avoid costly pressure-retaining recovery methods. Interwell installed its iDT barrier verification system on seven wells, using ME retrievable bridge plugs and ROV-retrievable receivers deployed rigless from a light well intervention vessel.
Year
UKCS
Challenge
A North Sea operator sought to optimise future Plug and Abandonment (P&A) operations by reducing risk, cost and complexity associated with completion recovery. Traditionally, uncertainty regarding potential pressure build-up beneath a shallow-set barrier can require the use of pressure-retaining recovery methods; which can increase operational time, equipment requirements and overall project costs.
The operator required a reliable method to verify long-term barrier integrity following plug installation and prior to completion recovery. The solution needed to provide confidence that no pressure had accumulated below the shallow-set barrier during the suspension period, while enabling deployment through a rigless intervention campaign and minimising offshore operational exposure.
Solution
Interwell deployed its Iconic Digital Transponder (iDT) barrier verification technology across seven North Sea wells as part of a pre-P&A intervention campaign. The objective was to establish a long-term subsea monitoring system capable of recording and verifying pressure conditions below a shallow-set barrier throughout the suspension period.
Each well was equipped with a shallow-set Medium Expansion (ME) Retrievable Bridge Plug (RBP) incorporating a Pump Open Sub (POS) and an iDT transponder. A custom-designed iDT receiver was installed within the tubing hanger profile using an IMENCO ROV-friendly latch system. Deployment was completed from a Light Well Intervention Vessel (LWIV), eliminating the need for a rig, while maintaining operational efficiency
The iDT system enables acoustic communication with the monitoring equipment located below the barrier. Following installation, successful communication between the transponder and receiver was confirmed subsea.
A Morse code light signal provided visual verification of system status, which was independently confirmed using an ROV. When future completion recovery operations commence, the debris cap and canopy can be removed and the receiver can be retrieved by ROV. Stored monitoring data can then be downloaded and analysed to verify that no pressure build-up has occurred beneath the shallow-set barrier, providing a robust basis for subsequent recovery and abandonment activities.
Value Created
The deployment of long-term subsea barrier monitoring technology provides operators with a data-driven approach to managing well integrity during the transition from suspension to final abandonment. By continuously monitoring conditions beneath the shallow-set barrier, the operator gains objective evidence that the barrier has maintained isolation throughout the monitoring period.
Verification of the absence of pressure build-up beneath the barrier significantly reduces uncertainty prior to completion recovery. This enables operators to evaluate the suitability of non-pressure-retaining recovery methods, avoiding the complexity and cost associated with pressure-retaining recovery equipment and procedures.
The rigless deployment methodology further enhances project economics by allowing installation from a LWIV. This approach reduces Mobile Offshore Drilling Unit (MODU) rig requirements, minimises offshore intervention time and lowers overall operational expenditure while maintaining high levels of safety and assurance.
In addition to direct cost savings, the solution improves operational planning and risk management by providing verifiable well condition data before P&A activities commence. The result is a safer, more efficient route to completion recovery and final abandonment, with reduced operational uncertainty and greater confidence in decision making.