Custom Straddle
APS - Anchored Production Straddle
This product can be used in:
The Product
The Anchored Production Straddle (APS)
The APS is designed with a wide range of dimensions and effective through-bore in mind when developing specific solutions for production control challenges. It's configured with two packer modules, standard spacer pipe in between and an anchoring module. Each Packer Module consists of a one-piece solid elastomer element supported by a tight mechanical barrier on each side. When expanded, a radial wall prevents extrusion of the packer element under strain or pressure. Additional anchoring modules as well as built-in PBR functionality can be incorporated.
Standard sizes in the following series have been tested in differential pressures and max temperatures in accordance with ISO 14310:2008 international standard up to validation grade V0.
Standard size HPHT Straddles
Differential pressures up to 345 bar (5.000 psi) at temperatures up to 150 °C.
Standard size HEX straddles
Differential pressure up to 207 bar (3000 psi) at temperatures up to 110 °C Standard size ME Straddles have been tested in differential pressures up to 241 bar (3500 psi) at temperatures up to 110 °C accordance with ISO 14310:2008 design validation V0.
Application
The APS can be used in temporary or permanent applications, and is equipped with high expansion bi-directional seal and anchor elements that can be set/retrieved in cross flow making it ideal for workover applications.
Key Benefits
- Other sizes available upon request
- Can be run on slickline, e-line, CT and pipe
- Modular design for various applications on-site
- Designed to meet the requirements of high expansion and effective through-bore; the standard straddle size is also ISO V0 approved
Download Product Sheet
Adaptability
Application Areas
Annulus Isolation
Isolate the annulus to prevent water influx, stop water production, and enhance oil and gas recovery, extending the life of your well.
Completion Repair
Repair old and new completions, including setting packers, leak testing, and straddle operations. Achieve cost savings compared to a full new completion.
Production Optimization
Prevent water influx, increase oil and gas production, and extend well lifespan. Isolate zones, retrofit gas lift, and optimize revenue through tailored solutions.
Temporary P&A
Interwell offers secure, efficient Temporary P&A solutions with advanced casing plugs, ensuring well integrity and compliance during well suspension and abandonment operations.
Well Integrity
Re-establish well integrity, extend well lifespan, and increase revenue. Efficient, cost-effective solutions compared to new completions.