Inter Removable Barrier Device - Pump Open
The Inter Removable Barrier Device - Pump Open (IRBD-PO) is a bidirectional barrier plug, assembled with the required pup joint size in both ends.
This product can be used in:
The Product
The Inter Removable Barrier Device - Pump Open (IRBD-PO)
The IRBD-PO is a bidirectional barrier plug, assembled with the required pup joint size in both ends. The assembly is integrated as part of the completion string and is qualified according to the ISO14310 V0 and ISO14998 V0.
It has an initial closed state and a final open state which is activated by applying a predefined pressure. The opening pressure is determined by a number of shear screws and it remains closed until the pressure above it has exceeded the shear value.
The barrier element, which is glass, then shatters; leaving a full-bore ID through the assembly for production and future intervention. The glass is designed to withstand extreme bidirectional loads and high temperatures, only small volume of it is required to withstand the load and it disintegrates into small particles after removal.
A secondary method for opening, e.g. milling or spear, is dependent on the deployment method used; coiled tubing, wireline and jointed pipe may be used.
Application
The IRBD-PO can be used for packer setting, pressure testing, fluid loss control, and providing a barrier against the reservoir.
Key Benefits
- ISO14310 V0 and ISO14998 V0 qualified bidirectional and gas tight barrier
- Run as part of the completion string or below an intervention packer
- Small volume and particle size when barrier element shatters
- Efficient removal
- Box/Pin Connections according to customer specifications
- No Interwell personnel required for installation or removal
Download Product Sheet
Adaptability
Application Areas
Interventionless Completion Installations
Interwell enhances production and eliminates intervention needs during and after completion installations by providing remotely operated completion tools.
Flow Control
We offer a wide range of products during and after the completion phase. Our flow control products are tested to highest level of industry standards and provide reduced time and HSE risks.